Mazda 13B-MSP Installationshandbuch Seite 12

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 18
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 11
3-5 Intercooler Installation
1. Remove the auxiliary temp sensor on the
bumper reinforcement, and rotate it 180°, then
reinstall it back to the original mounting
location.
2. Install the intercooler mounting bracket to the
bumper reinforcement mounting bolt. Then
install the intercooler to the bracket.
*Adjust the bracket to mounting intercooler
parallel.
(Parts Used #4, 5, 64)
3. Remove the plastic part between the lower
radiator hose and bracket. Bend the bracket up
and secure it with zip ties as shown.
4. Install the compression pipe C-2 and C-3
between the C-1 to the intercooler with
provided hose and hose band.
Secure C-2 bracket to the speed sensor
harness bracket (RH).
(Parts Used #9, 10, 33, 36, 40, 41)
5. Install the compression pipe C-4, C-5, and C-6
between the intercooler and throttle using the
provided hoses and hose bands. Connect the
Jet Air Fuel Mixing sir hose to the fitting on the
back of C-6 pipe. This hose has a large
amount of suction when idling and is the top
hose that routes behind the alternator. It is
important to connect this hose properly to this
location.
Seitenansicht 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 18

Kommentare zu diesen Handbüchern

Keine Kommentare